TM
Epic/Pole Mounted
Fixtures
Sheet 1 of 4
INSTALLATION INSTRUCTIONS
2/18/04
IMI-575
IMPORTANT: Read carefully before installing fixture. Retain for future reference.
General: Upon receipt of fixture thoroughly inspect for any
freight damage, which should be brought to the attention of
the delivery carrier. Compare the catalog description listed
on the packing slip with the fixture label on the housing to
assure you have received the correct merchandise.
Safety: This fixture must be wired in accordance with
the national electrical code and applicable local codes
and ordinance. Proper grounding is required to insure
personal safety. Carefully observe grounding procedure
under installation section. All work should be done by a
qualified electrician.
WARNING: Risk of Electric Shock. Disconnect power at fuse or circuit breaker before installing
or servicing.
ARM & FIXTURE INSTALLATION
Bishop Arm
Bishop Arm (VA6005-VA6008, VA6054-VA6057, VA6105-VA6108
& VA6154-VA6157)
See Figure 1.
1. Secure arm onto pole and orient.
2. Tighten the six set screws located near bottom of arm to
150 in/lbs. to secure arm.
Fixture Screws
Teflon Washers
Arm Cap
3. Loosen the three arm cap set screws and remove arm cap.
4. Pull fixture leads through arm to arm cap location.
5. Raise fixture to arm aligning locating pin and socket.
See Figure 2.
Arm Cap
Set Screws
6. Insert and tighten 4 fixture screws with Teflon washers, provided
in polybag, to 80 in/lbs.
7. Connect fixture leads to service leads.
8. Resecure arm cap with arm cap set screws tightened to
50 in/lbs.
Set Screws
Fig. 1
Traditional Arm (VA6009-VA6021 VA6058-VA6070,
VA6109-VA6121 & VA6158-VA6170)
See Figure 3.
Modern Top
1. Slip arm onto pole and orient.
2. Tighten the six set screws located near bottom of arm to
150 in/lbs. to secure arm.
3. Loosen the three arm cap set screws and remove arm cap.
4. Pull fixture leads through arm to arm cap location.
5. Raise fixture to arm aligning locating pin and socket.
See Figure 2.
Aligning Pin
Aligning Socket
6. Insert and tighten 4 fixture screws with Teflon washers, provided
in polybag, to 80 in/lbs.
7. Connect fixture leads to service leads.
8. Resecure arm cap with arm cap set screws tightened to
50 in/lbs.
Fig. 2a
These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible
contingency during installation, operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please
contact your nearest representative.
Customer First Center • 1121 Hwy 74 South • Peachtree City, GA 30269 IMI-575 AVU040300
TM
Epic/Pole Mounted
Fixtures
Sheet 3 of 4
INSTALLATION INSTRUCTIONS
2/18/04
IMI-575
IMPORTANT: Read carefully before installing fixture. Retain for future reference.
WARNING: Risk of Electric Shock. Disconnect power at fuse or circuit breaker before installing
or servicing.
Vertically lamped
1. Loosen and remove ring retaining screws globe retaining ring
and globe. Components are not tethered.
See Figure 5.
Options
FG, FR, SG & FRS
Fig. 4b
2. Remove two screws on ballast cover followed by ballast
cover. See Figure 7.
3. Unplug optic quick-disconnect.
4. For starter replacement, remove the plug-in starter from
receptacle and replace.
For fuse replacement, unscrew fuse holder cap and replace
fuse. Resecure fuse holder cap.
Tether
5. Plug optic quick-disconnect.
Door Screws
6. Resecure the ballast cover with the two screws.
7. Reinstall ring retaining screws securing globe retaining ring
and globe. In the case of type 3 refractive glass globe, use the
mark on globe bottom for orientation.
Option MA
C. Power Pack Replacement
Horizontally lamped
1. Loosen two door screws.
2. Lower door to tethered resting position. See Figure 4.
3. Loosen thumbscrew until rectangular washer can be rotated
90 degrees. See Figure 6.
4. Rotate reflector faceplate to release from screws using key
hole slots.
Ring Retaining Screws
Globe Retaining Ring
5. Unplug optic quick-disconnect.
6. Remove two screws on ballast cover followed by ballast
cover. See Figure 7.
Fig. 5a
Globe
7. Unplug service quick-disconnect.
8. Holding the handle, loosen the two screws holding the power
pack to the fixture housing. See Figure 8.
9. Holding the handle, rotate the power pack until free and lower.
10. Holding replacement power pack by handle, raise onto screw
heads and rotate.
Options
3R & 5R
11. Tighten the two screws while holding power pack in position.
12. Plug together the service quick-disconnect.
13. Resecure the ballast cover with the two screws.
14. Reconnect optic quick-disconnect and secure reflector by
keyhole slots and thumbscrew.
Ring Retaining Screws
Globe Retaining Ring
Globe
15. Raise door and secure with screws.
Fig. 5b
These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible
contingency during installation, operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please
contact your nearest representative.
Customer First Center • 1121 Hwy 74 South • Peachtree City, GA 30269 IMI-575 AVU040300
TM
Epic/Pole Mounted
Fixtures
Sheet 4 of 4
INSTALLATION INSTRUCTIONS
2/18/04
IMI-575
IMPORTANT: Read carefully before installing fixture. Retain for future reference.
WARNING: Risk of Electric Shock. Disconnect power at fuse or circuit breaker before installing
or servicing.
Vertically lamped
1. Loosen and remove ring retaining screws globe retaining
ring and globe. Components are not tethered.
See Figure 5.
Ballast Cover
Screws
2. Remove two screws on ballast cover followed by ballast
cover. See Figure 6.
Optic
Quick-
Disconnect
3. Unplug optic quick-disconnect.
4. Unplug service quick-disconnect.
5. Loosen the two screws holding the power pack to the
fixture housing. See Figure 7.
6. Holding the power pack by the handle, rotate the power
pack until free and lower.
Fig. 7a
7. Holding replacement power pack by handle, raise onto
screw heads and rotate.
8. Tighten the two screws while holding power pack in
position.
9. Plug together the service quick-disconnect.
10. Plug together the optic quick-disconnect.
11. Resecure the ballast cover with the two screws.
12. Reinstall ring retaining screws securing globe retaining ring
and globe. In the case of type 3 refractive glass globe, use
the mark on globe bottom for orientation.
Fuse
Starter
Handle
Service
Quick-Disconnect
Fig. 7b
Reflector
Keyhole Slot
Removal
Rectangular Washer
Thumbscrew
Screws
Fig. 6
Fig. 8
Power Pack Removal
These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible
contingency during installation, operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please
contact your nearest representative.
Customer First Center • 1121 Hwy 74 South • Peachtree City, GA 30269 IMI-575 AVU040300
|